Camberwell Coal Washery

Posted · Add Comment

The existing screen (bottom right hand corner) was providing insufficient capacity. An additional screen and support structure and foundations have been added to improve and increase the material flow (removing a bottleneck in the plant).

The photograph shows the catch-tray being lowered into position prior to installing the new screen.

Camberwell Coal Washery was last modified: April 10th, 2015 by Brian Close
 

Warning: array_reverse() expects parameter 1 to be array, string given in /home/izuio/close.com.au/public_html/wp-content/plugins/essential-grid/public/essential-grid.class.php on line 4968

Warning: Invalid argument supplied for foreach() in /home/izuio/close.com.au/public_html/wp-content/plugins/essential-grid/public/essential-grid.class.php on line 4974