The existing screen (bottom right hand corner) was providing insufficient capacity. An additional screen and support structure and foundations have been added to improve and increase the material flow (removing a bottleneck in the plant).
The photograph shows the catch-tray being lowered into position prior to installing the new screen.
Camberwell Coal Washery was last modified: April 10th, 2015 by