The stacker runs along the edge of the stockpile on continuous concrete beams and rails. After installation the rails and their fixings started to brake down and move. This movement resulted in the stacker not operating correctly. Close Consultants was appointed by Queensland Alumina to undertake an inspection of the stacker and report the findings. After detailed analysis […]
Eraring Power Station The hopper system consists of eight individual storage pods. Each pod is independent from the others to accommodate potential future mine subsidence. The pods are separated by a panel of polystyrene. The polystyrene is designed to crush and allow the pods to rotate in the event of subsidence taking place. The side walls (below […]
Fork Lift Attachment, Drum Rotator Designs have been undertaken for a number of different Drum Rotator attachments with various loading capacities. Client: East West Engineering
The boiler is a relatively fragile structure and required a separate strong and stiff frame for support during shipping
Industrial Garnet Processing Plant WA
This quick release skirt and clamp system was developed, patented, marketed and distributed Brimco Systems Pty Ltd a subsidiary company. The patent rights were eventually sold to a major mining component manufacturer.
Attritioner Support Frame model built in ACAD then transposed into SGASS
SGASS Model for Product Storage Shed, Steel portal frame, steel portal frames with a span of 33 m and with individual frames at 6 metre spacing
SGASS Model for Static and Dynamic Analysis.
The process plant is based upon a modular format and design with the capacity to be disassembled and relocated at some future time.