The process plant is based upon a modular format and design with the capacity to be disassembled and relocated at some future time.
The process plant is based upon a modular format and design with the capacity to be disassembled and relocated at some future time.
The existing screen (bottom right hand corner) was providing insufficient capacity. An additional screen, support structure and foundations have been added to improve and increase the material flow, removing a bottleneck in the plant . The photograph shows the catch-tray being lowered into position prior to installing the new screen
Jib Attachment – Fork Lift Truck – Client East West Engineeing
Braced Steel, Screen House Under Construction at Camberwell Coal, NSW.
Stockpile conveyor and transfer tower structure design model.
Industrial Boiler in Shipping Frame